       Hi,

      I have a question regarding the communication between main orchestration and Started one.

      Suppose I have a situation when the main orchestration starts other orchestration asynchroniously (Start Orchestration). I found a lot of examples how Started Orchistratin can provide its results to main orchestration via direct self correlated port passed as parameter. But if main orchestration that continues its run would like to have a ability to inform the started orchestration with some data that was received latter on. How that could be achieved?

      I thought that the main orchestration could pass correlation set as parameter and  then try to correlate somehow to started orchestration instance. Whold it be the right direction or some easier way is available.

      Thanks in advance,