BAM Continuation Question

Home Page › Forums › BizTalk 2004 – BizTalk 2010 › BAM Continuation Question

Viewing 0 reply threads
  • Author
    Posts
    • #23310

      Hello fellow BT Gurus! 

      I am working with BAM and would like to track two orchestrations end-to-end.  The two orchestrations are totally seperate and do not call each other.  The receive messages are different schemas but share the same unique identifier. 

      I would like to set up a BAM View to track the following:
      BeginOrder
      ProcessingOrder
      CompletedOrder
      BeginInvoice
      ProcessingInvoice
      CompletedInvoice

      The uniquie identifier would be a field PONumber on two schemas (one for each receive).  My goal is to have BAM alert the user if an Invoice is not processed in a certain time duration from when the Order was received.

      I am new to the Continuation concept.  From what I have read and researched it looks like I would do the following:
      Open the above activity in TPE
      Open Orchestration_Order and map the shapes to BeginOrrder, ProcessingOrder, CompletedOrder.
      Right click on Receive message and select Message Payload Schema and use PONumber as a continuation?
      Open the second orchestration Orchestration_Invoice and map the shapes to BeginInvoice, ProcessingInvoice, CompletedInvoice.
      Right click on Receive message and select Message Payload Schema and use PONumber from that schema as Continuation?

      Not sure about the Continuation structure?  Do I need to include the Pipeline?

      Thanks!!

Viewing 0 reply threads
  • The forum ‘BizTalk 2004 – BizTalk 2010’ is closed to new topics and replies.