Can one orchestration be active simultaneously

Home Page Forums BizTalk 2004 – BizTalk 2010 Can one orchestration be active simultaneously

Viewing 0 reply threads
  • Author
    Posts
    • #26563

      I have a biztalk application has partially finished its job. After each step, biztalk goes and updates a column in the database table.

      Now in the final step Biztalk is waiting for the end system to consume the message and update the database column so that it can gracefully exit.

      In the meantime if I drop in another message, Biztalk doesn’t create a second instance of the orchestration.

      Is this normal behaviour or is it configurable?

       

Viewing 0 reply threads
  • The forum ‘BizTalk 2004 – BizTalk 2010’ is closed to new topics and replies.