Hi All,
I use BizTalk 2006 R2 and SAP adapter v3 (WCF based).
I’m sending POS transaction log to SAP POSDM using BAPI. I send a BAPI request and on receiving a response I send COMMIT request.
It all works fine but BAPI response on the main request includes the whole message I am sending to SAP. I don’t really want the whole message being sent back, as it’s pretty much high volume interface.
In the data schema generated by importing from SAP, I see all request structure in a response schema as well. The only difference is – root element name includes “Response” word.
Is it the only possible behavior or it can be configured somewhere to avoid sending lots of data back and forth.
P.S. I am very new to SAP and in the project work basically on BizTalk side.
Thanks,
Nick